structural engineers
GR EN
where I am: Home page > Projects > Structural parts in ports > Platform for cruise ships in Darnah port - Libya
Platform for cruise ships in Darnah port - Libya

PROJECT:  Platform for cruise ships in Darnah port - Libya

CLIENT: Triton Consulting engineers Ltd.                                    

BRIEF DESCRIPTION:
 
Design of structural steel platform and accesses bridges. The project consists of:
  • The platform with dimensions 20x10m which rests on two concrete pilecaps at 14m. Pile caps are mounted on two steel piles D914 at 7.0m. The platform consists of two identical parts which are assembled to form the platform.
  • The concrete pile caps with the sections to connect to the steel piles.
  • Two steel footbridges with span of 28.9m for access to port breakwater. The footbridges are spatial structures from hollow sections.
The project apart from the dimensioning load case imposes the use of a small vehicle which, for some reason, may be found there.
 
The project stopped due to civil war.
 
Design year: 2009
Design standards: EN 1990

     See
     Also..