structural engineers
GR EN
where I am: Home page > Projects > Buildings > Extension of Public Hospital of Corfu
Extension of Public Hospital of Corfu

PROJECT:  Participation in the bidding for the extension of Public Hospital of Corfu

CLIENT: KATASKEVI S.A.                           

BRIEF DESCRIPTION:
 
Participation in the bidding for the construction "Design and construction of extensions and fitting-out at the General Hospital of Corfu" advanced final designs (compared to a detailed design was excluded the rebars cutting and shaping list as well as the details of the structural steel member joints). The design is comprised of:
 
  • New administration building. Single-storey building of reinforced concrete with a plan surface of 386m2
  • Addition of second floor on pediatric clinic. Extension of the reinforced concrete staircase, plan area 53m2 and addition of the structural steel second floor, plan area 380 m2.
  • Addition of first floor in an existing building, structural steel, plan area 240 m2
  • Pedestrian Bridge, connecting 2 existing buildings, with a 13 meters span and 1.20m width, structural steel.
 
The bidding, after submission of our proposal was interrupted.
 
Design years: 1993
Design standards: DIN, Greek Standard of Structural Concrete (EKOS), Greek Earthquake Design Standard (NEAK).

     See
     Also..