structural engineers
GR EN
where I am: Home page > Projects > Buildings > Olympic Stadium (OAKA) renovation - upgrading
Olympic Stadium (OAKA) renovation - upgrading

PROJECT:  Participation in the bidding for the construction of "renovation - upgrading of Olympic Stadium and new buildings VIP - Press and Doping Control".

CLIENT: THEMELI ATE.                                   

BRIEF DESCRIPTION:
 
Participation in the bidding for the construction of "renovation - upgrading of Olympic Stadium and new buildings VIP - Press and Doping Control" with the final design of steel connecting corridor between VIP -PRESS building and OAKA.
 
The main part of the structural steel connecting corridor width was 3.5m and a length of 18.4m. In this connected corridors for disabled, structural steel, width 1.5m and total length of 46.02m

The bidding, after submission of our proposal was interrupted.
 
Design year: 2002
Design standards: ENV 1993, Greek Standard of Structural Concrete (EKOS), Greek Earthquake Design Standard (NEAK).

     See
     Also..