structural engineers
GR EN
where I am: Home page > Projects > Special structures - Industrial > Deep water floating bearthing at Fira Santorini
Deep water floating bearthing at Fira Santorini

PROJECT:  Deep water floating bearthing at Fira Santorini


CLIENT: Triton Consulting Engineers Ltd
ASSOCIATED OFFICES: Triton Consulting Engineers Ltd

BRIEF DESCRIPTION:

Analysis of a catenary system for application to this problem. Writing software for PC in Fortran, which analyzes the position, the stressing of the chains and the sinking of buoys for different wind directions. Calculation of maximum minimum etc.
The application had the capability of different arrangements, number of nodes, positions, anchoring on the seabed or on land, number of ships, etc. Tested on the conditions of project and other possible variations.

The project was designed by Triton Ltd, in light of that software, is complete and operational.

Design years: 1997-8

     See
     Also..